中文
ENGLISH
Stable pile principle of quick die casting change system
The switching action is mainly dependent on the action of both hands, and the foot must reduce the chance of moving. Therefore, the props, vowin.cn/' target='_blank'>plastic vowin.cn/' target='_blank'>injection molded products, cleaning, etc. That must be used during the switch must all be placed on a special trolley, and they must be ordered in order to reduce the search time. The moving lines of the mold or the switching object must also be designed in such a way that they can be easily moved in and out. The sequence of switching operations must be rationalized and standardized.